The Granular Registry
Ctrlk
  • PROCESS
    • Storage Charge Records (SCRs)
    • Storage Charge Records (SCRs) and Storage Discharge Records (SDRs)
    • Storage Discharge Granular Certificate (SD-GC) Issuance
  • Time-Shifting
    • “Virtual Hybrid” (stand-alone storage)
  • CONTRACT CONFIGURATIONS
    • Summary of Contract Structures
    • Hybrid Project (co-located CFE generation & storage)
  • EXAMPLE TRANSACTIONS
    • Time Shifting
  • APPENDIX
    • FAQ
      • How is additionality determined?
      • What are the parallels to Green Hydrogen Electrolysis?
      • What if CFE does not align with optimal battery dispatch?
      • How does the PEC registry deal with the time lag of MER data?
      • What if the storage asset charges during zero MER hours?
      • How are PECs issued for energy storage different than carbon offsets?
      • Are PECs and carbon offsets mutually exclusive?
Powered by GitBook
On this page

Was this helpful?

  1. APPENDIX

FAQ

How is additionality determined?What are the parallels to Green Hydrogen Electrolysis?What if CFE does not align with optimal battery dispatch?How does the PEC registry deal with the time lag of MER data?What if the storage asset charges during zero MER hours?How are PECs issued for energy storage different than carbon offsets?Are PECs and carbon offsets mutually exclusive?
PreviousTime ShiftingNextHow is additionality determined?

Was this helpful?